If the project is predominantly a metal building, we would rather design and build it than bid it. If it is steel only, we will erect it as a sub anywhere in the country.
Structural Steel & PEMB Erection
3 × 6 erectors · up to 1M+ sq ft · nationwide
Our own crews, our own schedule. This is the scope we are known for and the one we never sub out.
Three crews of six, two of them traveling full time. Pre-engineered metal buildings, structural steel and miscellaneous metals — furnished and installed, or erection only as a standalone sub.