If it is predominantly a metal building, we would rather draw it than bid it.
General contracting
Full GC inside 50 miles of Cartersville. Steel travels anywhere.
Content needed
Section 09 — confirm the four figures in the numbers band below. Crew count, states and bond capacity come from your answers; the square footage total and the zero-missed-days claim need numbers you are comfortable publishing.
Small outfit. Long reach.
Three real reasons owners keep calling, in their own words rather than ours.
01
We self-perform steel erection
Our own crews set the iron. The one part of the schedule everything else hangs off is the part we control ourselves.
02
We have never failed to staff a site
Not once. Two of our three crews travel full time and have not missed a day in three years.
03
Partnerships across the steel industry
Fabricators, crane partners and erectors in every market we work. That bench is why we can show up anywhere in the country on short notice.
3
Steel crews six hands each
7
States with active work
1M+
Sq ft of steel erected
$20M
Single-project bond capacity
Two things, done all the way through.
All services →
Photo 1200×800 — crew setting iron, crane in frame
Service 01
Structural Steel & PEMB Erection
Three crews of six across the Southeast and beyond. Pre-engineered metal buildings, structural steel and miscellaneous metals — furnished and installed, or erection only as a standalone sub.
Read more →
Service 02
General Contracting & Design-Build
Full GC within roughly 50 miles of Cartersville, and design-build anywhere the project is predominantly a metal building. Projects from $2M up, three months to two years.